Foundation Checking Procedures

The importance of accurate foundation constructionrequirements, Rhino can fill your needs. Standard
and anchor bolt settings cannot be over-emphasized.metal building bay lengths are 20’ and 25’
Foundation errors and mislocation of anchor bolts arebetween main steel frames (optional bay lengths up
among the most frequent and troublesome errorsto 40’ available). A variety of endwall designs are
made in metal building construction. The followingavailable depending upon specific steel building
procedures and methods should help to minimizedemands. Post and beam endwalls are standard.
these costly errors and delays.Optional “rigid steel frame” endwall designs
1. To determine that the foundation is square,are also available when there may be a need to add
measure diagonal dimensions to be sure they are ofto the metal building in the future or perhaps a need
equal length.for a total opening such as an aircraft hangar door
2. To determine that the foundation is level, set up aOur staff of professionals can be of great assistance
transit or level and use a level rod to obtain thein determining the right metal building structure and
elevation at all columns and posts.steel frame required can be reached at
3. Carefully check the location of all anchor bolts1-888-320-7466.
against the “Anchor Bolt” drawing furnishedWe make it easy to purchase a quality steel building.
by Rhino. All dimensions must be identical to assure aRhino’s building specialist can assist in taking your
proper start-up.initial concept and developing the structural design
Rhino steel buildings Systems offers virtually anywith accessories that best accommodates your
type of structural design required (steel framesmetal building needs. You receive a complete set of
shown at left). Depending upon your building squareprints for your commercial steel building stamped by
footage, local codes and wind-rain-seismica steel building specialist licensed in your state.