Burning-free Brick Machine Installation

1.Brick machine installation locationgap, so as to avoid collision between vibration and
Burning-free brick machine installation layout should bedebugging After a good position to promote the
based on production sites, product processfixed rack plate. Skip back, raised his head pressure,
requirements to determine, in principle, requireddie box, start sending trigger to send board, observe
back-mixing on the material, sent board, the hostwhether the card block pallets forward into the
forming, sending bricks, conservation, and pallet flowmachine after the shaking table is correct place.
interference from each other, the proposedCorrect locking bolts after adjustment. Adjust the
installation of the foundation plan by row cloth.speed of advance and retreat to send board
2. the main machine installationconfiguration throttle to achieve, must be sent with
Including the main machine frame, shaking table,the brick adjustments meet the latter. Normal
hopper, model boxes and punch down and die andpre-production, test each batch of pallet size should
other components. Check the mechanical installationmatch the size of deviations in the permitted range
should be carefully whether the bumps duringcan be used.
transport, damaged, lost or missing pieces of the4. sending brick installation
relative position change. The main machine should beGet a good block and brick for forming pallet
installed pre-cast foundation in place to install,conveyor, conveyor belt speed can not be adjusted.
configure, vibration isolation pads, locking bolt.Installation, its axis should be the same machine axis
Installation, application level strict leveling instrumentvibration table, vibration table surface height and the
(in the range of machine ground plane corner,same height. In order to facilitate cleaning, and basic
diagonal High Low ≤ 1mm), to ensure the qualityfixed without sending brick, start the machine in place
of block molding machine. The hydraulic piping andto send bricks 2-3 plates, if the stable block and pallet
electric control lines required to connect, theconveying, no deviation can be used, the specific
confirmation, which require users to connectaction time set by conveyor belt connection to send
electronic control electronic control box location basedbricks to send board action action does not produce
care through buried pipe lines, to avoid personal injurya smooth transition between the subject jumps hit,
or shock control signal disorder.and just OK with brick pallets up to the circuit
In turn start the power, close the switch, set tobreakers Taiwan.
manual control console, open the oil pump, steering5. mechanical, electrical, hydraulic linkage
pump and check whether the anomaly, when theOther ancillary equipment and manually installed after
motor switch to normal, upper and lower buck tothe adoption of automatic control of linkage should
move the control head, sub head-oriented set ofbe empty, run the 5-10 board, observe the action,
observations along the guide column is running Nolayout, spacing and indicator light shows the
card balance resistance, pull rub, fever phenomenon,confirmation, debugging is completed.
mold box and pressure head may not have collision,6. pilot production and high degree of control block
check with the gap is uniform, relative motion isThe concrete brick machine after installation, should
smooth without abnormal friction.be feeding trial production, a serious observation of
3. sent to board plane to install Debuggingthe movement is accurate in place machinery. Check
Send trigger the same axis with the main frame,the quality of molding products, adjust the charge
adjust the pad to send a pallet rack fit orbital plane,head stopper, forming a block height to the height
note sent with the shaking table board machinerequired.
frame between the left side combination of 5-10mm