| Man has been indulging in construction activities ever | | | | speedy construction and at the lowest cost. |
| since evolution and the latest offspring of the human | | | | Following are the main parts of a pre engineered |
| mind are pre engineered steel buildings.These buildings | | | | steel building: |
| are constructed keeping in mind the aesthetic value, | | | | - Main Framing - this includes the steel frames of the |
| cost effectiveness, durability and fast construction. | | | | building. This frame is specially fabricated by the metal |
| This method has been successfully implemented in | | | | building supplier according to the requirements of the |
| countries like Europe, Australia, North America, among | | | | client. |
| others. Now it is India's turn to benefit from this | | | | - Panels and insulation - these fittings ensure that the |
| innovation. | | | | building is properly insulated and effective in all kinds |
| Parts of pre engineered buildings are manufactured in | | | | of weather conditions. |
| the factory and brought to the construction site in a | | | | - Doors & windows - these are properly |
| knock down form. These parts are then assembled | | | | attached to the main frame by welding or any other |
| together by the steel building supplier to take the | | | | effective method. |
| shape of a building. These parts, when put together, | | | | - False ceilings - this is especially necessary for |
| become a complete building envelop system which is | | | | residential buildings and offices. A false ceiling of rigid |
| light in weight, air tight, cost effective and totally | | | | boards is placed on a metal frame, which is hung |
| efficient. These buildings can be fitted with different | | | | from the roof. |
| building accessories like partitions, false ceilings, | | | | - Partitions - partitions are generally necessary in case |
| canopies, etc and it is made watertight using the | | | | of offices and residential houses. These partitions are |
| best quality materials. | | | | fixed to the metal frame and properly insulated to |
| Generally, the pre engineered steel buildings are low | | | | maintain the efficiency of the building. |
| rise buildings with a maximum height of 25-30 meters. | | | | - Flooring - floors in a pre engineered building are |
| Therefore they are best suited for use as residential | | | | made up of normal materials like concrete or cement. |
| homes, offices, showrooms, etc since they offer | | | | |